[1]
2005. Influence of the multi-year plan on performance indicators: an exploratory study at the City Hall of Victoria . REGE Revista de Gestão. 12, 3 (Sep. 2005), 29–45. DOI:https://doi.org/10.5700/issn.2177-8736.rege.2005.36524.