Business process prioritization criteria: a case study in the financial market

Authors

  • Robson Porfírio dos Santos Universidade Presbiteriana Mackenzie. Departamento de Engenharia de Produção
  • Thaiane Martins Salgado Universidade Presbiteriana Mackenzie. Departamento de Engenharia de Produção
  • Veridiana Rotondaro Pereira Universidade Presbiteriana Mackenzie. Departamento de Engenharia de Produção

DOI:

https://doi.org/10.1108/RAUSP-07-2020-0155

Keywords:

Prioritization, Financial sector, Business processes management, Improvement projects

Abstract

Purpose – This paper aims to analyze and examine how an organization from the financial sector prioritizes its business processes and what criteria are adopted to select the most appropriate process for improvement projects.
Design/methodology/approach – This descriptive research is based on an exploratory approach. Qualitative methodology was applied to a case study through on-site observation, documentation analysis and semi-structured interviews.
Findings – The results confirm criteria mentioned in the literature, such as financial aspects and strategic impacts, but also raised a new critical issue: automation potential of manual processes, reflecting the current movement of process automation.
Research limitations/implications – As a limitation of this study, it is worth mentioning the application in only one organization in the financial market and the small number of respondents, even though they occupy leadership positions in the organization.
Practical implications – As a practical implication, the present work offers a direction for managers of the financial sector in structuring and applying models for prioritizing processes aimed at organizational efficiency.
Social implications – Automation solutions for process improvement need careful study to minimize impacts in human resources reduction. In this sense, the eligibility of a process for automation must be carefully considered.
Originality/value – This paper presents the evolution of the process prioritization model adopted by a large institution in the financial market, which has a significant presence in the Brazilian and international markets as a commercial and wholesale bank.

Downloads

Download data is not yet available.

References

Archer, N. P., & Ghasemzadeh, F. (1999). An integrated framework for project portfolio selection. International Journal of Project Management, 17(4), 207–216, available at: https://doi.org/10.1016/S0263-7863(98)00032-5

Asad, M. M., Mohajerani, N. S., & Nourseresh, M. (2016). Prioritizing factors affecting customer satisfaction in the internet banking system based on cause and effect relationships. Procedia Economics and Finance, 36, 210–219, available at: https://doi.org/10.1016/S2212-5671(16)30032-6

Benedict, T., Bilodeau, N., Vitkus, P., Powell, E., Morris, D., Scarsig, M. and Furlan, J. (2013). BPM CBOK version 3.0: Guide to the business process management common body of knowledge: CreateSpace/ABPMP, Association of Business Process Management Professionals.

Carvalho, T. F., Maia, M. V., & Barbedo, C. H. S. (2012). O efeito da diversificação no valor das empresas listadas em bolsa no brasil. RAM. Revista de Administração Mackenzie, 13(1), 87–109.

Davenport, T. H. (1993). Process Innovation: Reengineering Work through Information Technology, Boston, MA: Harvard Business School Press.

Eisenhardt, K. M. (1989). Building theories from case study research. The Academy of Management Review, 14(4), 532–550, doi: https://doi.org/10.2307/258557.

Favretto, J., Roman, D., & Sehnem, S. (2016). Analise dos recursos impulsionadores da vantagem competitiva – o caso BRF foods. Revista Gestão da Produção Operações e Sistemas, 11(3), available at: https://doi.org/10.15675/gepros.v11i3.1477

Ferreira, A. (2002). Gestão empresarial de taylor aos nossos dias: evolução e tendências da moderna administração de empresas, São Paulo: Pioneira Thomson Learning.

Ferreira, A. F. R. (2017). A cadeia de valor e os modelos de business process outsourcing (BPO): modelos de negocio na oferta Portuguesa de serviços outsourcing. (mestrado, Universidade Nova de Lisboa.

Gil, A. C. (2019). Métodos e técnicas De pesquisa social, 7a ed., São Paulo: Atlas.

Gland, H. L. H., Morgan, L., & Witt, N. (2021). 2021 Process & performance management priorities & challenges, available at: Retrieved from www.apqc.org

Hammer, M. (2015). What is business process management?. In J. Vom Brocke, & M. Rosemann, (Eds), Handbook on business process management 1, 2nd ed., Heidelberg: Springer.

Harmon, P. (2016). The state of business process management, Retrieved from www.bptrends.com/bpt/wp-content/uploads/2015-BPT-Survey-Report.pdf

Houy, C., Fettke, P., & Loos, P. (2010). Empirical research in business process management – analysis of an emerging field of research. Business Process Management Journal, 16(4), pp. 619–661, doi: https://doi.org/10.1108/14637151011065946.

Kahn, B. (2020). Research priorities 2020-2022. MSI - Marketing Science Institute, 13Acesso em: 24/04/2021.

Karpen, I. O., Bove, L. L., Lukas, B. A., & Zyphur, M. J. (2015). Service-dominant orientation: measurement and impact on performance outcomes. Journal of Retailing, 91(1), 89–108, available at: https://doi.org/10.1016/j.jretai.2014.10.002

Kirakosyan, K., & Danaiata, D. (2014). Communication management in electronic banking. Better communication for better relationship. Procedia - Social and Behavioral Sciences, 124, 361–370, Retrieved from https://doi. org/10.1016/j.sbspro.2014.02.497

Kluyver, C. A. D., & Pearce, J. A. II. (2010). Estratégia: uma visão executive, 3 ed., São Paulo: Pearson Education do Brasil.

Kreuzer, T., Röglinger, M., & Rupprecht, L. (2020). Customer-centric prioritization of process improvement projects. Decision Support Systems, 133, 113286, Retrieved from https://doi.org/10.1016/j.dss.2020.113286

Lizarelli, F., Toledo, J., & Alliprandini, D. (2018). Integration mechanisms for different types of innovation: case study in innovative companies. Review of Business Management, 21(1), 5–32, Retrieved from https://doi. org/10.7819/rbgn.v0i0.3958

Marques, J. R. (2018). Projeto de melhoria de processos e outros pontos: como fazer e aplicar?. Acesso em: 2019.

Moormann, J., & Palvölgyi, E. Z. (2013). Customer-Centric Business Modeling: Setting a Research Agenda. Paper presented at the 2013 IEEE 15th Conference on Business Informatics.

Padovani, M., Carvalho, M. M. D., & Muscat, A. R. N. (2010). Seleção e alocação de recursos em portfolio de projetos: estudo de caso no setor químico. Gestão & Produção, 17(1), 157–180. doi: https://doi.org/10.1590/S0104-530X2010000100013.

Paim, R., Cardoso, V., Caulliraux, H., & Clemente, R. (2009). Gestão de processos: pensar, agir e aprender, Porto Alegre: Bookman.

Palvölgyi, E. Z., & Moormann, J. (2021). Customer process-centric artefacts: a literature review. Business Process Management Journal, 27(2), 615–637, doi: https://doi.org/10.1108/BPMJ-07-2020-0328.

Pereira, V. R., Maximiano, A. C. A., & Bido, D. D. S. (2019). Resistance to change in BPM implementation. Business Process Management Journal, 25(7), 1564–1586, doi: https://doi.org/10.1108/BPMJ-07-2018-0184.

PMI. (2017). A guide to the project management body of knowledge (PMBoK guide), 6th ed., Newtown Square, PA, Estados Unidos: Four Campus Boulevard.

Richard, S., Pellerin, R., Bellemare, J., & Perrier, N. (2021). A business process and portfolio management approach for industry 4.0 transformation. Business Process Management Journal, 27(2), 505–528, doi: https://doi.org/10.1108/BPMJ-05-2020-0216.

Shukla, V., Swarnakar, V., & Singh, A. R. (2021). Prioritization of lean six sigma project selection criteria using best worst method. Materials Today: Proceedings, Retrieved from https://doi.org/10.1016/j.matpr.2021.04.038

Silva, J. F. M. (2018). O impacto da automatização e inteligência artificial nos serviços partilhados. Dissertação de Mestrado, Universidade do Porto, Porto.

Thieves, J. J. J. (2001). Workflow - Uma tecnologia Para transformação do conhecimento nas organizações, 2nd ed., Florianopolis: Insular.

Vargas, R. V. (2010). Utilizando a programação multicritério (Analytic Hierarchy Process – AHP) para selecionar e priorizar projetos na gestão de portfolio. Paper presented at the PMI Global Congress, Washington, DC.

Vom Brocke, J., & Rosemann, M. (2015). Handbook on Business Process Management 1, 2nd ed., Heidelberg: Springer.

Weyer, S., Schmitt, M., Ohmer, M., & Gorecky, D. (2015). Towards industry 4.0 – Standardization as the crucial challenge for highly modular, multi-vendor production systems. IFAC-PapersOnLine, 48(3), 579–584, Retrieved from https://doi. org/10.1016/j.ifacol.2015.06.143

Yin, R. K. (2018). Case Study Research and Applications: Design and Met, 6th ed., Los Angeles: Sage Publications.

Downloads

Published

2022-03-14

Issue

Section

Research Paper